Watson Gloves 025 Overtime - Impact, Shock, Dirt, Debris Protection - Medium Size - MicroFiber Palm, Foam Palm, Silicone Palm, Mesh Back, Rubber Thumb, Rubber Finger, Neoprene Wrist - Black, Orange - Padded Palm, Padded Knuckle, Heavy Duty, Secure Grip, C
Description
D3O knuckle bar, heavy duty microfibre palm with foam padded palm patches, air flow mesh on back, heavy duty rubber on fingers and thumb, snug-fitting neoprene wrist with secure Velcro closure Shock absorption, impact protection. Textured finish provides a sure grip. Medium.
Specifications
46181504
Automotive
Watson Gloves
Watson Gloves
Gloves
ANSI/ISEA 138
Multicolor
Heavy Duty
John Watson Ltd
025-M
http://www.watsongloves.com
Black
025 Overtime
Work Gloves
Dirt
Medium